Testing Gap Analysis — Implementation Plan

Note (Phase 6 — File Reorganization): All test files have been moved from src/ to Testing/. Unit tests are under Testing/unit/ (mirroring the src/ structure), test utilities are in Testing/test-utils/, setup is at Testing/setupTests.ts, and E2E tests are in Testing/e2e/. The @test alias resolves to Testing/test-utils/. File paths in the original plan below reflect the pre-move locations. Current status (2026-05-09): This is a historical implementation plan, not an open task list. Many planned files now exist under Testing/, CI runs npm test, pgTAP, build, and the @release Playwright smoke suite, and the dashboard/pipeline-board items below were superseded by the /dashboard to /tasks redirect.

Context

PlanterPlan had zero unit tests when this historical plan was written, despite Vitest being fully installed and configured. The gap-findings.md audit (2026-03-24) identified 6 categories of E2E gaps against Notion requirements. Meanwhile, critical pure-logic modules (date-engine, tree-helpers, retry, payloadHelpers, pipelineMath, highlightMatches, export-utils) had no test coverage at all. This plan records the original phased approach that led to the current Testing/ layout.


Phase 0: Test Infrastructure Setup

0a. Add Vitest config to vite.config.ts

Add test block to the existing vite.config.ts (Vitest reads from Vite config automatically):

// Add to defineConfig:
test: {
  globals: true,
  environment: 'jsdom',
  setupFiles: './src/setupTests.ts',
  include: ['src/**/*.test.{ts,tsx}'],
  coverage: {
    provider: 'v8',
    include: ['src/shared/lib/**', 'src/shared/api/**', 'src/features/**/lib/**', 'src/features/**/hooks/**'],
    thresholds: { statements: 80 },
  },
},

File: vite.config.ts

0b. Add /// <reference types="vitest/config" /> to vite.config.ts

Needed for TypeScript to recognize the test property in defineConfig.

0c. Create shared test utilities

File: src/test-utils/factories.ts — Task/Project factory using @faker-js/faker:

  • makeTask(overrides?) → returns a minimal TaskRow stub
  • makeProject(overrides?) → returns a minimal Project stub
  • makeTaskList(count, overrides?) → returns flat array of tasks with parent relationships
  • makeTreeTasks(depth, breadth) → returns flat array forming a tree hierarchy

File: src/test-utils/supabase-mock.ts — Mock for planterClient's Supabase calls:

  • Mock supabase.from().select/insert/update/delete chain
  • Mock supabase.rpc()

File: src/test-utils/query-wrapper.tsx — React Query test wrapper:

  • Wraps components in QueryClientProvider with retry: false, gcTime: 0
  • Exports renderWithQueryClient() helper

File: src/test-utils/index.ts — Re-export factories and mocks


Phase 1: Pure Logic Unit Tests (Priority: HIGHEST)

These modules are pure functions with zero React/DOM dependencies — easiest to test, highest ROI.

1a. src/shared/lib/date-engine/index.ts (~40 tests)

File to create: src/shared/lib/date-engine/index.test.ts

Function Tests Key Scenarios
resolve() (internal, test via exports) 3 ISO string, Date object, null/invalid
formatDate() 4 Valid date+format, null input, invalid string, Date object
isPastDate() 3 Past date → true, today → false, future → false
isTodayDate() 3 Today → true, yesterday → false, null → false
addDaysToDate() 3 Positive days, negative days, null input
isDateValid() 3 Valid ISO, invalid string, null
endOfDayDate() 2 Sets to 23:59:59.999, null input
isBeforeDate() 3 Before → true, after → false, null inputs
compareDateAsc() 4 Less/greater/equal, nulls sort last
compareDateDesc() 4 Reverse of asc, nulls sort last
findTaskById() 3 Found, not found, null id
calculateScheduleFromOffset() 5 Normal offset, null parent, ancestor traversal, circular guard, missing start_date
toIsoDate() 5 YYYY-MM-DD passthrough, ISO timestamp, Date object, invalid, null
formatDisplayDate() 4 ISO timestamp (local), YYYY-MM-DD (UTC), null → "Not set", invalid
calculateMinMaxDates() 4 Normal children, empty array, null dates, single child
recalculateProjectDates() 5 Forward shift, backward shift, skips completed, no dates → skip, zero diff → empty

1b. src/shared/lib/date-engine/payloadHelpers.ts (~20 tests)

File to create: src/shared/lib/date-engine/payloadHelpers.test.ts

Function Tests Key Scenarios
parseDays() (internal, test via constructors) Covered implicitly
constructUpdatePayload() 10 Instance + days_from_start, instance + manual dates, manual overrides calculated, template (no date math), clear days + no manual, all nullables
constructCreatePayload() 10 Instance with offset, instance with manual dates, template origin, position calculation (maxPosition + POSITION_STEP), root_id passthrough, full form data

1c. src/shared/lib/tree-helpers.ts (~22 tests)

File to create: src/shared/lib/tree-helpers.test.ts

Function Tests Key Scenarios
buildTree() 8 Flat→tree, sorts by position, orphan nodes go to roots, empty array, single node, deep nesting (5 levels), rootId filter, BFS depth traversal
separateTasksByOrigin() 3 Mixed origins, all instance, empty array
updateTaskInTree() 3 Update root node, update nested child, nonexistent ID (no-op)
mergeTaskUpdates() 2 Delegates to buildTree correctly
updateTreeExpansion() 3 Expands matching IDs, collapses non-matching, recursive into children
mergeChildrenIntoTree() 3 Replace children at target parent, nested parent, nonexistent parent (no-op)

1d. src/shared/lib/retry.ts (~10 tests)

File to create: src/shared/lib/retry.test.ts

Function Tests Key Scenarios
retry() 10 Success on first try, success on retry, AbortError retried, status 503 retried, Postgres code '20' retried, network error retried, 400 fails fast, 401 fails fast, 404 fails fast, exhausts retries then throws

Use vi.useFakeTimers() to avoid real delays.

1e. src/features/dashboard/lib/pipelineMath.ts (~12 tests)

File to create: src/features/dashboard/lib/pipelineMath.test.ts

Function Tests Key Scenarios
bucketizeProjects() 4 Multiple statuses, missing status → defaults to PLANNING, empty projects, unknown status
groupTasksByProject() 3 Multiple projects, null root_id → 'unassigned', empty
groupMembersByProject() 3 Normal grouping, null project_id, empty
determineNewStatus() 4 Column ID string match, project ID match, number overId (no match), unknown → null

1f. src/features/library/lib/highlightMatches.ts (~10 tests)

File to create: src/features/library/lib/highlightMatches.test.ts

Function Tests Key Scenarios
getHighlightSegments() 10 Single match, multiple matches, case insensitive, no match, empty query, null text, special regex chars in query, match at start, match at end, adjacent matches

1g. src/features/projects/lib/export-utils.ts (~6 tests)

File to create: src/features/projects/lib/export-utils.test.ts

Function Tests Key Scenarios
exportProjectToCSV() 6 Generates correct headers, escapes quotes in title/description, task type detection (root/subtask/phase), empty tasks → no-op, null tasks → no-op, calls download mechanism

Mock document.createElement, URL.createObjectURL, document.body.appendChild/removeChild.

Phase 1 Total: ~120 unit tests


Phase 2: Hook Integration Tests (Priority: HIGH)

These require React Query wrapping and Supabase mocking. More setup but critical for confidence.

2a. Create React Query test wrapper

Uses the src/test-utils/query-wrapper.tsx from Phase 0c.

2b. src/features/tasks/hooks/useTaskMutations.ts (~12 tests)

File to create: src/features/tasks/hooks/useTaskMutations.test.ts

Scenario Tests
createTask mutation 3 — success calls planterClient.Task.create, optimistic update adds to cache, error rollback
updateTask mutation 3 — success calls planterClient.Task.update, optimistic update modifies cache, error rollback
deleteTask mutation 3 — success calls planterClient.Task.delete, optimistic removal, error rollback
toggleComplete mutation 3 — toggles is_complete + status, optimistic update, error rollback

2c. src/features/projects/hooks/useProjectMutations.ts (~10 tests)

File to create: src/features/projects/hooks/useProjectMutations.test.ts

Scenario Tests
createProject 3 — success, cache invalidation, error
updateProject 3 — success, optimistic update, error rollback
deleteProject 2 — success, cache invalidation
updateProjectStatus 2 — status change, optimistic update

2d. src/features/tasks/hooks/useTaskQuery.ts (~8 tests)

File to create: src/features/tasks/hooks/useTaskQuery.test.ts

Scenario Tests
Data fetching 3 — returns task tree, per-section loading states, staleTime behavior
Tree building 3 — calls buildTree correctly, separates by origin, handles empty
Error states 2 — fetch error, partial failure

2e. src/features/dashboard/hooks/useProjectPipelineLogic.ts (~6 tests)

File to create: src/features/dashboard/hooks/useProjectPipelineLogic.test.ts

Scenario Tests
Drag-drop status change 3 — determines new status, calls mutation, optimistic reorder
Edge cases 3 — drop on same column (no-op), invalid drop target, concurrent mutations

Phase 2 Total: ~36 hook tests


Phase 3: E2E Gap Coverage (from gap-findings.md)

3a. Hierarchy & Structural Invariants

New feature file: e2e/features/project/subtask-hierarchy.feature New/updated steps: e2e/steps/project.steps.ts

Scenarios:

  1. Create subtask under a task (5th level)
  2. Verify subtask CRUD (create, read, update, delete)
  3. Verify milestones are visible/expanded by default on project load
  4. Negative: cannot transform a Phase into a Milestone (hierarchy invariant)

Estimated: 4 scenarios, ~15 steps

3b. Functional Logic & Automation

New feature file: e2e/features/project/task-automation.feature New/updated steps: e2e/steps/tasks.steps.ts

Scenarios:

  1. Mark parent complete → all children auto-marked complete
  2. Child task due dates roll up to parent phase/milestone
  3. Dependency prompt appears when completing task with outstanding dependents

Estimated: 3 scenarios, ~12 steps

3c. Roles & Account Management

Updated feature file: e2e/features/auth/permission-enforcement.feature New/updated steps: e2e/steps/permission.steps.ts

Scenarios:

  1. Coach role: can view all tasks, can only edit coaching-labeled tasks
  2. Limited user: can only edit assigned tasks, cannot edit unassigned
  3. (Signup confirmation and password recovery are auth-provider dependent — mark as manual/deferred)

Estimated: 2 scenarios, ~10 steps

3d. Library & Template Management

New feature file: e2e/features/library/template-management.feature New/updated steps: e2e/steps/library.steps.ts

Scenarios:

  1. Admin creates new template in master library
  2. Admin edits existing template directly
  3. Task shows "in-library" visual indicator
  4. Add project task to library

Estimated: 4 scenarios, ~16 steps

3e. Phase Unlocking

New feature file: e2e/features/project/phase-unlocking.feature New/updated steps: e2e/steps/project.steps.ts

Scenarios:

  1. Complete all tasks in Phase 1 → Phase 2 unlocks
  2. Incomplete Phase 1 → Phase 2 remains locked
  3. Skip: "No Due Dates" mode deferred (not yet implemented per codebase)

Estimated: 2 scenarios, ~8 steps

Phase 3 Total: ~15 new E2E scenarios across 4-5 feature files


Phase 4: API Layer Tests (Priority: MEDIUM)

4a. src/shared/api/planterClient.ts (~20 tests)

File to create: src/shared/api/planterClient.test.ts

Requires mocking Supabase client (src/shared/db/client.ts). Use vi.mock().

Area Tests Key Scenarios
Project.create() 3 Creates root task, calls initialize_default_project RPC, returns project
Project.getWithStats() 2 Joins members/tasks counts, handles missing project
Task.create/update/delete 4 CRUD operations call correct Supabase methods
Task.clone() 3 Calls clone_project_template RPC with correct args, date shifting params
Task.updateParentDates() 3 Fetches children, calls calculateMinMaxDates, updates parent
TaskResource.setPrimary() 2 Sets primary flag, unsets others
rpc() wrapper 3 Delegates to supabase.rpc, retry wrapping, error propagation

Phase 4 Total: ~20 tests


Additional Gaps Discovered During Analysis

Beyond gap-findings.md, the following gaps were identified:

A. Reporting Analytics Logic

  • src/features/projects/hooks/useProjectReports.ts (97 LOC) — completely untested
  • Reports feature files (reports-display.feature, reports-selector.feature) exist but cover display only, not data correctness
  • Recommendation: Add unit tests for useProjectReports in Phase 2 extension (~4 tests)

B. Realtime Subscription Logic

  • src/features/projects/hooks/useProjectRealtime.ts (68 LOC) — untested
  • E2E has realtime-updates.feature but unit-level subscription setup/teardown untested
  • Recommendation: Add unit tests verifying channel subscribe/unsubscribe lifecycle (~4 tests)

C. Settings Hook

  • src/features/settings/hooks/useSettings.ts (91 LOC) — untested mutation logic
  • E2E has profile-settings.feature but optimistic update logic untested at unit level
  • Recommendation: Add to Phase 2 extension (~3 tests)

D. Team Hook

  • src/features/people/hooks/useTeam.ts (63 LOC) — member CRUD untested at unit level
  • Recommendation: Add to Phase 2 extension (~3 tests)

E. AuthContext

  • src/shared/contexts/AuthContext.tsx (162 LOC) — session hydration, role loading, sign in/out untested
  • Recommendation: Add integration tests verifying auth state transitions (~6 tests)

F. Missing E2E for Reporting Export

  • gap-findings.md notes CSV/PDF export is missing from E2E
  • export-csv.feature exists but only covers basic CSV; PDF and automated email reports not covered
  • Recommendation: Extend export-csv.feature once PDF export is implemented; add E2E scenario for report page chart rendering

Summary: Test Counts & File Map

Phase New Test Files Approx Tests LOC Covered
0 — Infrastructure 4 utility files + vite.config change
1 — Pure Logic 7 test files ~120 ~890 LOC
2 — Hooks 5 test files ~36 ~530 LOC
3 — E2E Gaps 4-5 feature files + step updates ~15 scenarios E2E coverage
4 — API Layer 1 test file ~20 ~616 LOC
Total 17-18 new files ~176 unit + ~15 E2E ~2,036 LOC

Current file locations (after Phase 6 reorganization):

Testing/test-utils/factories.ts
Testing/test-utils/query-wrapper.tsx
Testing/test-utils/index.ts
Testing/setupTests.ts
Testing/unit/shared/lib/date-engine/index.test.ts            (Phase 1a)
Testing/unit/shared/lib/date-engine/payloadHelpers.test.ts    (Phase 1b)
Testing/unit/shared/lib/tree-helpers.test.ts                  (Phase 1c)
Testing/unit/shared/lib/retry.test.ts                         (Phase 1d)
Testing/unit/features/dashboard/lib/pipelineMath.test.ts      (Phase 1e)
Testing/unit/features/library/lib/highlightMatches.test.ts    (Phase 1f)
Testing/unit/features/projects/lib/export-utils.test.ts       (Phase 1g)
Testing/unit/features/tasks/hooks/useTaskMutations.test.ts    (Phase 2b)
Testing/unit/features/projects/hooks/useProjectMutations.test.ts (Phase 2c)
Testing/unit/features/tasks/hooks/useTaskQuery.test.ts        (Phase 2d)
Testing/unit/features/dashboard/hooks/useProjectPipelineLogic.test.ts (Phase 2e)
Testing/unit/shared/api/planterClient.test.ts                 (Phase 4a)
Testing/e2e/features/project/subtask-hierarchy.feature        (Phase 3a)
Testing/e2e/features/project/task-automation.feature          (Phase 3b)
Testing/e2e/features/library/template-management.feature      (Phase 3d)
Testing/e2e/features/project/phase-unlocking.feature          (Phase 3e)
Testing/e2e/features/auth/permission-enforcement.feature      (Phase 3c)
Testing/e2e/steps/permission.steps.ts                         (Phase 3c)
Testing/e2e/steps/project.steps.ts                            (Phase 3a, 3e)
Testing/e2e/steps/tasks.steps.ts                              (Phase 3b)
Testing/e2e/steps/library.steps.ts                            (Phase 3d)

Verification

  1. After Phase 0: npm test runs without errors (0 tests found, 0 failures)
  2. After Phase 1: npm test → all ~120 pure logic tests pass; npm run build still succeeds
  3. After Phase 2: npm test → all ~156 tests pass (120 + 36 hooks)
  4. After Phase 3: npm run test:e2e → new E2E scenarios pass against running dev server
  5. After Phase 4: npm test → all ~176 tests pass
  6. Coverage check: npx vitest --coverage → shared/lib/ at 90%+, hooks at 70%+
  7. CI: Current CI runs npm ci, dependency guardrails, architecture verification, lint, npm test, npm run db:local:test, npm run build, and npm run test:e2e:release.

Execution order recommendation:

Historical only. New release-hardening coverage should start from docs/testing/gap-findings.md current status and the active release plan, not from the original Phase 0-4 sequence above.