Goal: Use the website as your slide deck. Smooth scrolling, confident pauses.
[SCREEN: Top of index.html. The "NEXT GEN CREDIT SCORING" Header matches your opening.]
- "Good afternoon. We are Team LOQI. This is the future of Credit Risk."
- "We have built a production-grade Quantum Pipeline on the IQM Garnet Processor."
[ACTION: Scroll down SLOWLY from Hero, stop JUST BEFORE 'Key Achievements'. Talk to the audience.]
- "But before we show the results, let's talk about the Problem we faced."
- "The Credit Crunch:"
- "Real Quantum Hardware is expensive and slow."
- "Submitting 2,000 circuits one-by-one would take hours and bankrupt our API budget."
- "Most teams just run on simulators and call it a day."
- "We refused to do that."
- "We built a Batch Execution Engine that reduced API overhead by 99%, making real hardware training possible."
[ACTION: Scroll to the 'Metrics Dashboard' section.]
- "And that engineering breakthrough led to these numbers:"
- [POINT to 99% Card]: "Here is that 99% efficiency gain. We solved the bottleneck."
- [POINT to 89% Card]: "Which allowed us to achieve Proof of Learning on real hardware, reducing loss by 89%."
- [POINT to 71.5% Card]: "And importantly, we validated a 71.5% accuracy on real hardware using a parallel validation track."
[ACTION: Scroll to 'Two Tracks, One Goal' Battle Cards.]
- "We didn't just guess. We ran a Two-Track strategy:"
[HOVER over Track A (Red Card)]
- "Track A (LOQI) was about Production."
- "We optimized for the IQM Garnet chip (20 qubits) using our batching engine."
- "This proved the engineering viability."
[HOVER over Track B (Green Card)]
- "Track B (Validation) was about Science."
- "We used Qrisp to solve the Class Imbalance problem."
- "We sacrificed some accuracy to quadruple our recall. This model actually catches bad loans."
[ACTION: Scroll to 'Interactive Visualizations' - Click 'Hardware Trajectory']
- "Finally, the proof is in the data."
- "This blue line is our model learning on the Quantum Chip."
- "In just 24 hours, we delivered a solved engineering problem, verified hardware execution, and a business-ready model."
- "We are ready to scale. Thank you."