Trace: PRD prd-public-leaderboard-mvp-pareto-frontier-visualization (stub, draft)
Status: stub — full requirements develop in Phase 4 (T+5..T+6 weeks).
Scope summary:
- Static Next.js 15 SSG → pollmevals.com
- Pareto frontier (cost-vs-quality) per task family
- Cost column MANDATORY (closes industry gap per EVID-001/005)
- WCAG AA accessibility
Blocked by: PRD-001 + PRD-002 + PRD-003
Next: at Phase 4 start, pick chart library, design system tokens, hosting provider.
Trace: PRD prd-public-leaderboard-mvp-pareto-frontier-visualization (stub, draft)
Status: stub — full requirements develop in Phase 4 (T+5..T+6 weeks).
Scope summary:
Blocked by: PRD-001 + PRD-002 + PRD-003
Next: at Phase 4 start, pick chart library, design system tokens, hosting provider.