Trace: PRD prd-weekly-run-cadence-operational-reliability (stub, draft)
Status: stub — full requirements develop in Phase 4 (T+4..T+5 weeks).
Scope summary:
- Cron: понедельник 03:00 UTC
- Failure policy: store failed evals with error_class, mark run degraded if available_models < 5
- Drift detection: Δ > 2σ on baseline tasks → public alert
- Methodology version pin
Blocked by: PRD-001 + PRD-002
Next: at Phase 4 start, expand PRD-003 (decide alert channel, drift formula, backfill policy).
Trace: PRD prd-weekly-run-cadence-operational-reliability (stub, draft)
Status: stub — full requirements develop in Phase 4 (T+4..T+5 weeks).
Scope summary:
Blocked by: PRD-001 + PRD-002
Next: at Phase 4 start, expand PRD-003 (decide alert channel, drift formula, backfill policy).