Skip to content

Flow-IPC pipeline #1030

Flow-IPC pipeline

Flow-IPC pipeline #1030

Manually triggered August 12, 2026 00:41
Status Cancelled
Total duration 4h 11m 21s
Artifacts 1

main.yml

on: workflow_dispatch
set-vars
3s
set-vars
Matrix: build-and-test
Matrix: doc-and-release
Fit to window
Zoom out
Zoom in

Annotations

3 errors and 1 warning
clang-15-relwithdebinfo-tsan-cxx17
The run was canceled by @ygoldfeld.
clang-15-relwithdebinfo-tsan-cxx17
The operation was canceled.
Flow-IPC pipeline
The run was canceled by @ygoldfeld.
setup
Tag [v2.0.0] already exists. The repo/VERSION file will require a bump, before the next release. However this should be done *just* ahead of release creation and must follow semantic versioning conventions, especially regarding when to bump major/minor/patch components. When ready to do this consult [https://semver.org/] as needed.

Artifacts

Produced during runtime
Name Size Digest
ipc-test-logs-clang-15-relwithdebinfo-tsan-cxx17
1.57 MB
sha256:f4c1801248485257db2c04c8776b2aa3f95065f84f2825e13ee62b1566d5eb6d