diff --git a/docs/reports/progressReports/2026-10-17-035835Z-unified-v3-progress.md b/docs/reports/progressReports/2026-10-17-035835Z-unified-v3-progress.md new file mode 100644 index 000000000..b8f4b2f7f --- /dev/null +++ b/docs/reports/progressReports/2026-10-17-035835Z-unified-v3-progress.md @@ -0,0 +1,267 @@ +--- +title: "Unified Roadmap v3 progress — 2026-10-17T03:53:00Z" +generated_at: "2026-10-17T03:58:35Z" +as_of: "2026-10-17T03:53:00Z" +window_start: "2026-10-16T03:53:00Z" +display_timezone: "Europe/Vienna" +roadmap_revision: "63267427a1d6dbb05cdb637da0c3aa4e83f1a57d" +previous_report: "2026-10-16-033400Z-unified-v3-progress.md" +comparison_baseline: "Previous cutoff 2026-10-16T03:27:41Z; 24h first-parent source 7eccb9d0c5803b680509454c8e998cb9ebef9612" +method: "show-progress/2; concrete milestones; task scenarios; no unsupported readiness weights" +status: "partial evidence snapshot" +--- + +# Unified Roadmap v3 progress + +## Process health and expectations + +**Source delivery is recovering, but operational acceptance remains blocked; authentication qualification shows localized churn.** Since the previous report, the facts-first dashboard has reached static deployment, the ordinary delivery route now collects native checkout evidence, and the private managed pipe and host transaction have accepted SOURCE qualification. These are useful completed milestones. They have not produced current telemetry collection, the unattended V3 host lifecycle, or another whole-outcome closure. + +The prior report expected assembled-candidate review to reduce omitted integration joins. It has helped close individual defects, but the authentication path still encountered two fresh qualification failures and a failed metadata acquisition before the current successor reached source acceptance. New review rounds repeatedly repaired clocks, reads and evidence retention; the latest 120-method cohort and maintained export remain unrun. This is a **Churning** signal for that bounded integration path, alongside productive repairs and accepted diagnostics—not a programme-wide or individual productivity verdict. Actual rework effort and a complete cycle count are unavailable. The corrective step is the existing owner's exact complete-plan and assembled-path qualification, preserving failures and refusing a qualification claim from source review alone. + +| Scope | Recorded expectation | Observed delivery / deviation | Verdict and next step | +|---|---|---|---| +| ENV receiver journal / authentication | Previous report: receiving-owner/version decision overdue; source qualification to precede runtime | `/3` journal source delivered; 47/47 host transaction SOURCE accepted. Authentication first failed at audit retrieval, later after restore/build at verifier construction; current source accepted, qualification pending | Recovering / Churning / Blocked, medium confidence. Finish the exact fresh qualification; supply real receiver binding before operational acceptance | +| Facts-first telemetry | Selected 16 Oct: release facts/coverage before calibrated explanations | #4623 passed source/browser checks and static Pages deployment/readback; actual provider/store/browser path absent | Recovering, high confidence for static scope; Blocked operationally. Qualify one real item with success/Unknown/recovery/correction | +| Ordinary delivery / CTX | Prior real restart/adoption proof still required; new pilot targets reduced coordination effort | #4608/#4609/#4611 deliver governing and automatic evidence changes. One observed delivery took 20m22s; model effort unknown | Recovering. No evidence yet for the selected 80% coordination-effort reduction; use necessary deliveries, retain restart gate | +| Shared WASM | Accepted 0.3.0 compatibility feeds S1; next complete API inventory | Terminal Process/reset retirement needs a producer correction; candidate prepared only | At risk, medium confidence. Existing .5-P2 → S1 correction requires actual model, runtime, publication and installed readback | +| Other declared outcomes | Previous task scenarios; most supplier dates missing | No new accepted whole outcome; Governance's exact package-feed block persists | Blocked or insufficiently observed by item; no basis for an overall on-track claim | + +**Formal closure remains 3/19 (15.8%): sixteen open outcomes.** The same nineteen rows and three finite Done scopes exist at the previous report cutoff and at the separate 24-hour source baseline. Change is **0 whole outcomes / 0 percentage points of formal row closure**. This count is not engineering-effort completion. No supported programme readiness percentage or completion date is available. Games product work and conditional section-6 scope are excluded; the shared WASM correction stays in its existing producer outcome. + +Evidence cutoff: **17 October 03:53:00 UTC / 05:53:00 CEST**. The newest earlier report by embedded cutoff is **16 October 03:27:41 UTC**. The trailing day begins **16 October 03:53:00 UTC**. Read-only retrieval continued after cutoff; only immutable events completed before cutoff or unchanged source/status were admitted. No later acquisition result or review verdict is inferred. Report delivery CI is separate from status-evidence collection. + +## Accepted work and remaining outcomes + +The table covers every current section-2 outcome. **h** means prospective engineering owner-hours; ranges are low-confidence analyst scenarios, not observed labor or agent-runtime conversion. Detailed tasks below explain revisions and adverse cases. Source/publication/installation/activation retain separate acceptance boundaries. + +| Outcome / owner | Since previous report | Done overall | Still to do | Remaining effort / complexity | Health / forecast revision | +|---|---|---|---|---|---| +| [UTEL](../../roadmaps/utel-release-successor.md) / telemetry/Coordination | Source-only backing controls → closed callback/managed composition and accepted 18/18 joined SOURCE qualification; current fresh containment policy selected. Source does not establish provider enforcement or collection. | Published predecessor scope, closed callback construction and 18/18 managed/private pipe SOURCE accepted. Fresh production containment, authority, installed collection and original .103 outcome remain unaccepted. | Finite production budgets and headroom, independently observed enforcement/authority/enrollment; original .103 reconciliation; separately admitted coherent successor and installed collection. | 16–42 h working / 32–81 h adverse; mostly medium/high, reasons below | Recovering at source; Blocked operationally; working 18–46 → 16–42 h | +| [ROUTINE-COVERAGE](../../roadmaps/2026-10-07-unified-development-roadmap-v3.md) / programme/telemetry | Automatic native checkout/delivery evidence is delivered; this adds one source-delivery witness, without complete phase-span or usage collection. | Collection/review contracts and explicit unavailable-telemetry reporting exist. Authentic settled-population, phase-span and usage coverage remain incomplete. | After shared UTEL installation, reconcile settled population and collector identity, wire phase spans, qualify review samples and native usage gaps. | 8–23 h working / 16–40 h adverse; mostly medium/high, reasons below | Insufficient evidence for end-to-end coverage; retained scenario | +| [V2-EFF-01](../../roadmaps/process-efficiency-telemetry.md) / telemetry/dashboard/receiver | Dashboard facts/coverage source → hosted 29-browser-case qualification and static Pages deployment/readback; actual provider/store/browser journey remains open. | Schema/correction source, facts/coverage presentation, 29 hosted Chromium checks and static Pages delivery/readback accepted. Current runtime collection, installed route and later calibrated explanations remain open. | First qualify one actual facts route with success, interruption/Unknown, recovery and correction; later qualify model explanations/calibration only for their selected behavior. | 14–44 h working / 28–74 h adverse; mostly medium/high, reasons below | Recovering at presentation; Blocked operationally; working 18–54 → 14–44 h | +| [V2-PROC-01](../../roadmaps/2026-10-05-shared-process-supervision.md) / Coordination | No new original-pair publication or consumer acceptance established. New shared host source is an input only. | Four-receiver candidate and original-failure reconciliation remain accepted. Public original pair, actual policy/runtime and Linux containment remain open. | Actual controller/policy/revocation proof, reconciled original pair publication, ordinary receiver adoption, then Linux containment and distinct consumer joins. | 20–54 h working / 40–100 h adverse; mostly medium/high, reasons below | Blocked at runtime/publisher; retained scenario | +| [V2-CTX-01](../../roadmaps/2026-10-05-programme-context-efficiency.md) / programme driver | Duplicate pilot coordination requirements retired; automatic native checkout reader and corrected admission assessment delivered in #4608/#4609/#4611. | Typed returns/watchers/restart source plus ordinary automatic checkout/delivery readback accepted. Genuine interruption/recovery and selected installed adoption remain open; savings unproved. | Genuine operation/restart and qualified consumer adoption/retirement; measure any selected savings claim without making it an activation gate. | 4–13 h working / 10–28 h adverse; mostly medium/high, reasons below | Recovering; ordinary source delivery improved; working 6–19 → 4–13 h | +| [TSDD-KNOWLEDGE-01](../../roadmaps/tsdd-knowledge-wizard.md) / SDD/Templates | No new full public provider/Wizard cohort established in inspected owner plans or PR inventory. Historical retained fixture remains accepted. | Bounded project-knowledge and guidance source; historical Wizard/private receiver proof. Coherent public knowledge/Wizard/provider and fresh/retained journeys remain open. | Compatible successor/provider selection, shared publication/acquisition, and distinct supported-provider/fresh/retained knowledge assertions. | 12–32 h working / 24–60 h adverse; mostly medium/high, reasons below | Blocked at coherent public receiver; retained scenario | +| [SVG-RELEASE-D](../../roadmaps/svg-release-d.md) / producer/workspace owners | No new successor full-workspace or selected activation acceptance established. | Historical Release-D .1–.5 accepted. Current successor full Wizard workspace, promised upgrade and selected activation remain open. | Reuse shared TSDD cohort; qualify successor browser/retaining joins, selected activation and rollback. | 4–11 h working / 10–24 h adverse; mostly medium/high, reasons below | Blocked at successor cohort; retained scenario | +| [SVG-COHERENCE-01](../../roadmaps/svg-coherence-and-instancing-01.md) / Rendering/Templates | Prior actual-player composition acceptance retained; no new software-performance, GPU or installed acceptance established. | Coherence/instancing source and .5 actual-player composition accepted. Update-path/performance, late GPU and public adoption remain open. | Remaining software/update-path/performance, consumer candidates, one consolidated host-GPU batch, publication/adoption/removal. | 17–53 h working / 36–92 h adverse; mostly medium/high, reasons below | At risk at performance/GPU join; retained scenario | +| [GAME-BOX2D-01 / GAME-PORTAL-01 P3](../../roadmaps/game-area-portals.md) / Game/Rendering/Templates | Finite accepted closure retained; no scope reopening or new closure. | Finite managed headless presentation, package-only/public Template adoption, preserving receiver and sixteen-stage structural-cost scope accepted. Browser/server/P4 are separate. | None in accepted finite scope. | 0 h; finite scope already accepted | Done; retained scenario | +| [FABLE-ADOPT-01 / GAME-TEMPLATE-01](../../roadmaps/2026-10-01-staged-fable-game-adoption.md) / Rendering/Game/Templates | Prior public 0.19 and actual-player dependency remain accepted; new shared WASM correction is prepared only and cannot supply installed reference acceptance. | Workspace 0.19 public payload/signature and source examples accepted. Full installed WASM/browser/reference, retaining upgrade and accessibility remain open. | Reusable reference coverage, actual browser/WASM/accessibility, compatible publication and distinct clean/retained creation. | 17–52 h working / 36–90 h adverse; mostly medium/high, reasons below | At risk; full installed reference pending; retained scenario | +| [WASM-SHARED-01](../../roadmaps/2026-10-02-shared-wasm-foundation.md) / Game | S1 inventory exposed missing atomic terminal Process/session retirement. Game candidate fc7da994 prepares API/model/qualification changes; independently accepted runtime/source delivery is not established. | Public 0.3.0 and accepted SC2 compatibility/installed boundary retained. Remaining guest SDK/profiles, consumer joins and .7 remain open. | Review/qualify terminal Process correction, genuine coherent publication and installed readback before consumer pin; remaining SDK/profiles, consumer joins and proven duplicate retirement. | 11–35 h working / 22–66 h adverse; mostly medium/high, reasons below | At risk; corrective source preparation; working 8–27 → 11–35 h | +| [LEARN-01](../../roadmaps/2026-09-12-095059-stable-policy-orchestration-and-statistical-learning.md) / Coordination/telemetry/receivers | Host transaction and checkpoint exporter source advance dependencies. No genuine persistent receiver lifecycle, enrollment or comparison accepted. | Causal/custody and maintained caller/ABI source accepted. Genuine cold runtime, grant/turn/capture/restart/cleanup, census/enrollment and dataset disposition remain open. | Causal/cold runtime joins, actual grant/turn/capture/restart/cleanup and census, enrollment and locked or truthful stopped-window comparison. | 18–62 h working / 35–107 h adverse; mostly medium/high, reasons below | Blocked at authentic runtime/receiver; retained scenario | +| [COORD-BOARD-V2-01](../../roadmaps/../coordination/2026-09-29-coordination-v2-board-design.md) / organization/SDD/Templates/selected products | Finite accepted closure retained; no scope reopening or new closure. | Declared organization outcomes and two public qualification cohorts accepted. Unselected fleet/remote/skill routes and product acceptance excluded. | None in accepted finite scope. | 0 h; finite scope already accepted | Done; retained scenario | +| [V2-LANG-01](../../roadmaps/2026-09-29-language-independent-workspaces-and-agent-integration.md) / Coordination/Governance/SDD/Templates/Sandbox | Governance #462 remains draft at bf2a3687; normal feed/restore blocker unchanged in fresh native readback. | Portable/capture component source and finite retention controls accepted. Package-backed Verify/SDD, physical retention, C3/C4 and installed language matrix remain open. | Exact Commands/Artifacts feed availability and normal gate; actual Verify/SDD/physical-capture joins; C3/C4 and selected language matrix. | 18–58 h working / 36–110 h adverse; mostly medium/high, reasons below | Blocked at package feed; medium confidence; retained scenario | +| [OPS-TYPED-01](../../roadmaps/2026-10-01-typed-administrative-fsharp-quint.md) / Coordination/qualification owners | No new production replacement/retirement acceptance established; previously accepted ordinary helper activations remain inputs. | Selected ordinary helper source/activations accepted. Published production replacement and administrative retirement population remain open. | Freeze remaining administrative population; published replacement/refusal/rollback, then parity-proven retirement. | 6–19 h working / 12–40 h adverse; mostly medium/high, reasons below | Insufficient evidence for remaining adoption; retained scenario | +| [FBX-07](../../roadmaps/2026-10-01-staged-fable-game-adoption.md) / Templates | Public 0.19 fresh/retained receiver remains accepted; no newly selected upstream qualification observed. | Public 0.19 fresh/retained ANSI and strip-ansi receiver accepted. Stable upstream netstandard2.1 compatibility is unqualified; alpha.2 remains executable baseline. | Refresh compatibility disposition; qualify only genuinely selected update, then publication/adoption if required. | 6–21 h working / 12–40 h adverse; mostly medium/high, reasons below | At risk at compatibility decision; retained scenario | +| [UNITYC-01](../../roadmaps/../2026-09-08-144823-unity-native-shim-fable-client-design-roadmap.md) / Unity Client owner | No new native engine acceptance in inspected owner plan or public PR inventory. | Managed-reference/browser source is an input. Genuine Editor/Server, selected publication/installation and product outcomes remain open. | Bound current native/product population and actual licensed environment; qualify real Editor/Server and later selected installed/product scopes. | 9–36 h working / 20–70 h adverse; mostly medium/high, reasons below | Insufficient evidence; environment dependency; retained scenario | +| [V3-ENV-01](../../roadmaps/2026-10-13-provisioned-podman-execution.md) / host provisioner/Coordination/receivers | Overdue /3 source contract → delivered #1012; accepted 47/47 host transaction SOURCE and public signed-checkpoint/exporter source. Authentication source accepted, but latest 120-method qualification unrun. | Ordinary rootless/offline/OCI scope, typed journal, controlled checkpoint/exporter and 47/47 host transaction SOURCE accepted. Current authenticated qualification, production durability/storage/installed lifecycle remain open. | Fresh complete authentication qualification, actual receiver host/volume/root/custody tuple, native storage comparison, installed unattended lifecycle, second-machine and independent cleanup. | 27–80 h working / 55–161 h adverse; mostly medium/high, reasons below | Recovering at source; Churning in authentication qualification; Blocked operationally; working 29–84 → 27–80 h | +| [V3-IMPROVE-01](../../roadmaps/2026-10-15-development-process-improvement.md) / programme/diagnostic/receiver owners | Finite accepted closure retained; no scope reopening or new closure. | Finite trial accepted: preflight, diagnostics, concise source guidance and selected source cohort. Throughput benefit unproven. DIAG and packaged installed transfers stay open with existing owners. | None in closed finite trial; open diagnostic and carrier transfers are explicitly excluded from this closure. | 0 h; finite scope already accepted | Done; high confidence at narrowed boundary; retained scenario | + +## Concrete changes and the separate trailing day + +- **16 Oct 03:49:58 UTC:** Coordination #1009 delivered the previously pending terminal callback-read root. This is **since the previous report but before the 24-hour window**. It is not new progress within that trailing day. The later separate pending-cut/stdio/source-construction changes fall within both comparisons. +- **16 Oct 05:10:42:** [Coordination #1012](https://github.com/FS-GG/FS.GG.Coordination/pull/1012) delivered typed pending challenges and journal-version source. This resolves the previous source decision frontier; it does not establish durable production receiver acceptance. +- **16 Oct 07:35–08:04:** [#4608](https://github.com/FS-GG/.github/pull/4608), [#4609](https://github.com/FS-GG/.github/pull/4609) and [#4611](https://github.com/FS-GG/.github/pull/4611) removed duplicated pilot coordination and delivered automatic checkout evidence plus the admission-assessment correction. #4609's ordinary readback reported matching tested/delivered trees, all eight required checks passed and no evidence issues. The witness covers one projection job entry, not every job's filesystem. +- **16 Oct 08:50–15:00:** Closed callback construction and coherent managed endpoint adoption landed; [ADR-0095](../../adr/0095-utel-resource-containment-for-fresh-profiles.md) selected finite enforced resource containment for fresh profiles. [Current-only scope](../../roadmaps/utel-release-successor.md#selected-current-source-scope--2026-10-16) removes backward-compatibility requirements for active work while retaining substantive assertions and immutable original evidence. These are source/policy changes; fresh production budgets and enforcement are not accepted. +- **16 Oct 12:29–12:32:** [Facts-first #4623](https://github.com/FS-GG/.github/pull/4623) merged at `e992bc2f`; [Pages run 38900904329](https://github.com/FS-GG/.github/actions/runs/38900904329) succeeded. The owning plan records 153 inert Python and 29 hosted Chromium passes plus HTTP byte/revision readback. Static presentation is accepted; the original snapshot clocks remain historical and current collection is unknown. +- **16 Oct 16:55–17:12:** The private managed pipe advanced from the preserved 16/18 failure to [accepted 18/18 joined SOURCE qualification](https://github.com/FS-GG/.github/issues/4517#issuecomment-6220575332), exact `6429d3a8`. Supplied source/Atlas correspondence was accepted. Private native merge is supplier-observed; no reporter or public CI observation of that merge is claimed. +- **16 Oct 19:06–19:11:** The host transaction reached [accepted 47/47 SOURCE qualification](https://github.com/FS-GG/.github/issues/4516#issuecomment-6222834756), exact `77f202fe`, with all 31 reached custody records settled. Supplied delivery/Atlas correspondence was accepted subsequently; production authentication, durability and native adoption remain unproved. +- **16 Oct 23:18–17 Oct 01:35:** [Checkpoint exporter #1024](https://github.com/FS-GG/FS.GG.Coordination/pull/1024) delivered premerge-qualified source `6b2bab64`. Its original [postmerge run 38980742106](https://github.com/FS-GG/FS.GG.Coordination/actions/runs/38980742106) failed with underlying cause unknown. [Retention repair #1025](https://github.com/FS-GG/FS.GG.Coordination/pull/1025) delivered `638a0476`, with premerge and [protected postmerge success](https://github.com/FS-GG/.github/issues/4516#issuecomment-6228023512). The latter retains one permitted canonical early-lifecycle retry; it neither explains nor erases the earlier failure. +- **17 Oct 01:09–03:50:** Authentication work retained a failed audited restore, a failed metadata acquisition, then a successful bounded acquisition. A fresh 02:18 qualification passed offline audited locked restore and strict build, then failed at verifier construction before key birth, export or all 96 methods. A separately admitted [metadata diagnostic](https://github.com/FS-GG/.github/issues/4516#issuecomment-6228872751) observed matching held images across the host/unit namespace; it does not reconstruct the original failed tuple. At 03:50 the [host-root provenance source](https://github.com/FS-GG/.github/issues/4516#issuecomment-6229264405), `9e663bab`, was accepted. All 120 prepared methods/export remain unrun at cutoff. A new metadata-only scope has future checkpoints; socket/SDK/crypto qualification is not admitted by it. +- **17 Oct 03:52 source preparation:** Locally inspected Game `fc7da994` adds the existing S1 terminal Process correction across API/model and maintained qualification source (23 changed files from `4163448c`). Owner reports inert syntax/AST checks only; no model run, CLR/Fable/Worker, pack, PR or publication is credited. SC2's related adapter candidate is product context, outside this report's denominator. Its mechanical inventory is seventeen public operations, correcting an earlier manual eighteen; neither count measures acceptance. + +The trailing-day formal baseline is protected `.github` `7eccb9d0c5803b680509454c8e998cb9ebef9612` (16 Oct 03:38:15 UTC), the latest first-parent tree at/before 03:53. It contains 19 rows / 3 Done. It supplies source/formal status, not exact historical runtime, readiness or attributed effort. Except #1009 above, listed milestone events follow both comparison starts. No exact-window readiness or total-effort delta can be reconstructed from later observations. + +## Complications, churn and expectation variance + +| Scope / first observation | Classification / observed effect | Cause and response / owner | Effort and calendar effect | +|---|---|---|---| +| Authentication: 17 Oct 01:09 | Recurring integration repair; restore failed before 83 methods, later verifier failed before 96, latest 120 still unrun | Official audit retrieval unavailable in selected private network; new bounded acquisition initially rejected coding. Later image predicate failed; exact original conjunct unknown. Supplier and Programme accepted bounded decoding/diagnostic/source repairs | At least two qualification failures plus one acquisition failure in reviewed sequence. Complete review-round count/rework h unknown. No full qualification ETA; fresh metadata/plan checkpoints only | +| Host/unit identity: diagnostic accepted 03:09 | Newly observed; surprise relative to earlier risk record unknown | Ten matching held images show host-root ownership mapped to overflow UID inside unit. Accepted source now carries authenticated host provenance; actual old failure is not proved | New implementation and qualification work despite successful restore/build. Owner source estimate 35–45 minutes from about 03:10; source accepted at 03:50, roughly 40 minutes, within that preparation interval | +| Coordination exporter: 16 Oct 23:18–23:58 | New postmerge failure after premerge PASS; underlying cause unknown | Diagnostic retention #1025 accepted; original failed run remains failed. Protected successor success includes one retained early-lifecycle retry | Fix removed an evidence-retention defect; no causal repair or first-attempt-only claim. Existing shared-source estimates include repair contingency; actual rework unmeasured | +| UTEL fresh policy: 16 Oct 10:26, current-only direction 15:00 | Deliberate scope/acceptance-policy clarification | ADR-0095 uses enforced resource bounds for a new profile; legacy universal-copy bound remains null/unproved. Current source need not retain obsolete variants | UTEL remaining scenario falls modestly, partly accepted source and partly scope/allocation correction. Not a measured productivity gain | +| WASM terminal Process: source prepared 17 Oct 03:52 | Newly identified correction; surprise unknown | Full S1 inventory needs reset payload then whole-session retirement before next dispatch. Existing producer owns API/model/qualification and coherent successor | Additive 3–8 active h working / 6–16 adverse; no reopening of original 0.3.0 receipts, no new roadmap row | +| Governance feed: present in previous report, still blocked | Ongoing external dependency; no new qualification progress observed | Commands absent / Artifacts 2.3.0 unavailable at normal gate; producer publication/readback needed | Unknown supplier waiting, separate from retained active-work scenario. Focused 230-pass suite does not replace normal gate | +| Receiver/production environment: ongoing, exact first observation unavailable | Operational block across ENV/LEARN/UTEL and consumers | Actual persistent receiver host/volume/root/custody/access binding and installed container/config/workspace/authenticated owner facts missing | No dated unblock. Historical .103 attempted-unknown/unreplayed, .104 held, 439 reservations preserved; no waiting-to-zero conversion | + +The previous ENV `/3` decision blocker is resolved **at source**; the current boundary is authenticated qualification and actual receiver/production binding. Retaining the old “await version decision” next step would hide real progress. Conversely, number of PRs or prepared test methods cannot compensate for the still missing integrated/native assertions. No complete phase-span or model-effort telemetry supports a rework share, total-cost variance, 80% saving or individual performance score. + +## Estimate basis and shared gaps + +For **each of the nineteen named outcomes**, original total effort baseline, previous total forecast, actual attributed engineering/agent effort and current actual-plus-remaining total are unavailable; their absolute/relative total variance is unknown. The previous report supplies prospective ETC only. Failed work already consumed is not added again to future ETC. Hosted compute and external/CI waiting remain separate and unaggregated. + +For **all sixteen open outcomes**, previous/current numerical readiness is unknown and same-scope percentage-point movement is unavailable: no frozen acceptance weights and complete earned assertion population support a number. The denominator remains each owning section-2 outcome, including hard unresolved joins. The three Done scopes retain 100% of their finite definitions; this is formal acceptance only, not effort weighting. Accepted milestones above are the concrete progress despite missing percentages. No equal-item readiness index is computed. + +Working/adverse ranges below are low-confidence bottom-up analyst scenarios anchored to the previous report's named tasks. They are not owner commitments, calibrated percentiles or measured throughput. An adverse case allows further relevant integration/qualification repair; external waiting is still additional and may be indefinite. Conditional owner working days use one available owner at **four focused h per Monday–Friday day** after all inputs/authority arrive. This is a planning convention, not observed capacity or a date promise; available owners, host slots and CI queues are unmeasured. No elapsed agent minutes are converted to engineering h. + +Shared work is allocated once: ENV owns common host authentication, provisioning and unattended lifecycle; UTEL owns its distinct production resource/enrollment assertions and coherent telemetry publication/install. ROUTINE/EFF/LEARN depend on that install and estimate only their own assertions. TSDD owns common Wizard/SDD/Templates acquisition/setup; Release-D/FABLE cover distinct acceptance. WASM owns its new producer correction/publication/readback; FABLE and SC2 cannot claim another producer implementation. PROC Linux enforcement and LANG per-language entrypoints remain distinct from ENV common setup. No programme sum/date is offered: supplier waiting, scope overlap in historical estimates and actual integrator capacity prevent a defensible total. + +## Per-item tasks, forecast and acceptance limits + +Each item inherits the total-effort/readiness fields above. Its overview row supplies accountable owner, accepted assertions, before/after change and remaining definition of Done; its linked owning plan is canonical. Evidence freshness is the protected roadmap and owning-plan revisions in Sources, supplemented only by the specified native/owner observations. No new PR events means no observed source event in that query, not no unobserved runtime work. + +### UTEL + +- Fresh production budgets/headroom and provider/recipient enforcement, authenticated clock/custody/enrollment joins: **8–21 h working / 16–40 h adverse**; high complexity because integrated maximum-valid-input, stress and fault evidence must establish finite enforced limits. Common host authentication construction is charged only to ENV. +- Exact publisher/original-effect reconciliation: **2–5 h working / 4–9 h adverse**; high complexity because uncertain originals cannot be replayed or relabeled. +- Coherent publication and both-feed readback: **2–4 h working / 4–7 h adverse**; medium complexity; maintained route, unknown feed/custody waiting. +- Installed real provider/receiver/correction/reopen journey: **4–12 h working / 8–25 h adverse**; high complexity because source acceptance does not establish runtime/store behavior. + +**ETC:** 16–42 h working / 32–81 h adverse, low confidence over the listed prospective tasks. 18–46 → 16–42 h: accepted joined source and current fresh containment replace further universal-copy preparation for fresh profiles; historical universal-copy proof remains unproved, and common host authentication is allocated to ENV. This mixes accepted work with a scope/allocation correction, not measured savings. Previous adverse 36–85 → current 32–81 h. **Conditional active duration:** previous 5–12 → current 4–11 owner working days after named inputs, plus qualification/observation/CI waits. Whole calendar completion/date remains unknown; no supplier date or guaranteed capacity. **Health:** Recovering at source; Blocked operationally; assessment confidence medium where native failures/acceptance are observed, otherwise low for unobserved installed boundaries. **Next milestone / re-estimation trigger:** Suppliers propose numeric budgets and enforcement evidence from the accepted integrated source; Programme accepts an exact fresh profile. No supplier completion date is established. + +### ROUTINE-COVERAGE + +- Refresh actual collector/settled-population join: **1–3 h working / 2–5 h adverse**; complexity medium because original identities and missing attribution. +- Wire collection and reconcile required phase spans: **4–12 h working / 8–20 h adverse**; complexity high because multiple producer/consumer joins. +- Sample review/capture and native usage coverage: **3–8 h working / 6–15 h adverse**; complexity medium because frozen sampling population. + +**ETC:** 8–23 h working / 16–40 h adverse, low confidence over the listed prospective tasks. Previous/current working 8–23 → 8–23 h; adverse 16–40 → 16–40 h. Retained scenario, because reviewed evidence does not establish a reduction or newly bounded work; this is not a claim of unchanged actual effort. **Conditional active duration:** previous 2–6 → current 2–6 owner working days after named inputs, plus qualification/observation/CI waits. Whole calendar completion/date remains unknown; no supplier date or guaranteed capacity. **Health:** Insufficient evidence for end-to-end coverage; assessment confidence medium where native failures/acceptance are observed, otherwise low for unobserved installed boundaries. **Next milestone / re-estimation trigger:** Observe one admitted settled collection population with explicit phase and usage denominators after shared installed UTEL is available. + +### V2-EFF-01 + +- Qualify canonical correction/completion semantics on the selected current store: **4–12 h working / 8–20 h adverse**; high complexity, causal/store identity and partial failure. +- Finish distinct facts-feed integration and real-item browser/rollback assertions: **4–14 h working / 8–24 h adverse**; high complexity, genuinely installed inputs despite accepted static UI. +- Later selected explanation/provider calibration and bounded pilot: **6–18 h working / 12–30 h adverse**; high complexity, authentic population and unknown observation duration. These remain in whole-feature scope; they do not gate the first facts release. + +**ETC:** 14–44 h working / 28–74 h adverse, low confidence over the listed prospective tasks. 18–54 → 14–44 h: static facts presentation/browser delivery removes part of implementation; operational and later calibration work remain. Deferred explanations are not silently removed from whole-feature scope. Previous adverse 36–90 → current 28–74 h. **Conditional active duration:** previous 5–14 → current 4–11 owner working days after named inputs, plus qualification/observation/CI waits. Whole calendar completion/date remains unknown; no supplier date or guaranteed capacity. **Health:** Recovering at presentation; Blocked operationally; assessment confidence medium where native failures/acceptance are observed, otherwise low for unobserved installed boundaries. **Next milestone / re-estimation trigger:** Qualify the single real-item provider → receiver/store → projection → browser route; authentic host/enrollment facts are still required. + +### V2-PROC-01 + +- Controller trace repair and genuine inert qualification: **2–6 h working / 4–11 h adverse**; complexity high because actual controller lifetime/read closure. +- Scoped policy/revocation and reconciled original pair publication: **4–10 h working / 8–18 h adverse**; complexity high because live authority and consumed original identity. +- Selected ordinary receiver adoption and retirement: **4–10 h working / 8–18 h adverse**; complexity medium because already qualified four-receiver candidate. +- Linux containment, distinct consumer joins and consolidation: **10–28 h working / 20–53 h adverse**; complexity high because enforcing backend/descendant cleanup. + +**ETC:** 20–54 h working / 40–100 h adverse, low confidence over the listed prospective tasks. Previous/current working 20–54 → 20–54 h; adverse 40–100 → 40–100 h. Retained scenario, because reviewed evidence does not establish a reduction or newly bounded work; this is not a claim of unchanged actual effort. **Conditional active duration:** previous 5–14 → current 5–14 owner working days after named inputs, plus qualification/observation/CI waits. Whole calendar completion/date remains unknown; no supplier date or guaranteed capacity. **Health:** Blocked at runtime/publisher; assessment confidence medium where native failures/acceptance are observed, otherwise low for unobserved installed boundaries. **Next milestone / re-estimation trigger:** Resolve actual scoped policy/runtime and original publisher custody before a separately admitted publication. Original 38495729817/a1 stays failed and consumed. + +### V2-CTX-01 + +- Genuine operation/restart and original reservation reconciliation: **2–7 h working / 6–16 h adverse**; high complexity, historical holds and actual interruption. +- Selected driver adoption/retirement, rollback and ordinary evidence reuse: **2–6 h working / 4–12 h adverse**; medium complexity, exact receiver joins. No separate benefit experiment is needed for correctness adoption. + +**ETC:** 4–13 h working / 10–28 h adverse, low confidence over the listed prospective tasks. 6–19 → 4–13 h: automatic checkout collection and governing simplification remove one manual source-delivery integration slice; actual restart/consumer proof remains. Previous adverse 14–39 → current 10–28 h. **Conditional active duration:** previous 2–5 → current 1–4 owner working days after named inputs, plus qualification/observation/CI waits. Whole calendar completion/date remains unknown; no supplier date or guaranteed capacity. **Health:** Recovering; ordinary source delivery improved; assessment confidence medium where native failures/acceptance are observed, otherwise low for unobserved installed boundaries. **Next milestone / re-estimation trigger:** One genuine necessary operation/restart and retained reservations readback, followed by selected consumer adoption; scheduling/capacity unknown. + +### TSDD-KNOWLEDGE-01 + +- Coherent successor selection and provider/Wizard joins: **4–10 h working / 8–18 h adverse**; complexity high because source/publication compatibility. +- Public release, acquisition and shared empty-cache receiver setup: **4–12 h working / 8–22 h adverse**; complexity high because original custody and immutable package joins. +- Knowledge bound, fresh generation and retained extraction/upgrade: **4–10 h working / 8–20 h adverse**; complexity medium because precise 10 MiB/collision assertions. + +**ETC:** 12–32 h working / 24–60 h adverse, low confidence over the listed prospective tasks. Previous/current working 12–32 → 12–32 h; adverse 24–60 → 24–60 h. Retained scenario, because reviewed evidence does not establish a reduction or newly bounded work; this is not a claim of unchanged actual effort. **Conditional active duration:** previous 3–8 → current 3–8 owner working days after named inputs, plus qualification/observation/CI waits. Whole calendar completion/date remains unknown; no supplier date or guaranteed capacity. **Health:** Blocked at coherent public receiver; assessment confidence medium where native failures/acceptance are observed, otherwise low for unobserved installed boundaries. **Next milestone / re-estimation trigger:** Freeze the actually published coherent Wizard/SDD/Templates selection and supported provider routes before full fresh/retained qualification. + +### SVG-RELEASE-D + +- Successor full-workspace/browser and retaining-join assertions: **3–8 h working / 7–17 h adverse**; complexity medium because shared cohort reuse with distinct outcomes. +- Selected activation/readback and rollback: **1–3 h working / 3–7 h adverse**; complexity medium because effective public pins/default. + +**ETC:** 4–11 h working / 10–24 h adverse, low confidence over the listed prospective tasks. Previous/current working 4–11 → 4–11 h; adverse 10–24 → 10–24 h. Retained scenario, because reviewed evidence does not establish a reduction or newly bounded work; this is not a claim of unchanged actual effort. **Conditional active duration:** previous 1–3 → current 1–3 owner working days after named inputs, plus qualification/observation/CI waits. Whole calendar completion/date remains unknown; no supplier date or guaranteed capacity. **Health:** Blocked at successor cohort; assessment confidence medium where native failures/acceptance are observed, otherwise low for unobserved installed boundaries. **Next milestone / re-estimation trigger:** Full successor Wizard workspace acceptance from that shared cohort; selected activation is separately evidenced. + +### SVG-COHERENCE-01 + +- Bounded current workload/research scope refresh: **1–3 h working / 2–5 h adverse**; complexity medium because realistic repeated glyph populations. +- Remaining software reconciliation/performance and reference assertions: **6–20 h working / 12–34 h adverse**; complexity high because actual-player acceptance removes one integration slice but update/performance semantics remain. +- Consumer candidates and one consolidated host-GPU batch: **6–18 h working / 12–31 h adverse**; complexity high because genuine external hardware results. +- Publication/adoption and duplicate removal: **4–12 h working / 10–22 h adverse**; complexity medium because compatible installed consumers. + +**ETC:** 17–53 h working / 36–92 h adverse, low confidence over the listed prospective tasks. Previous/current working 17–53 → 17–53 h; adverse 36–92 → 36–92 h. Retained scenario, because reviewed evidence does not establish a reduction or newly bounded work; this is not a claim of unchanged actual effort. **Conditional active duration:** previous 5–14 → current 5–14 owner working days after named inputs, plus qualification/observation/CI waits. Whole calendar completion/date remains unknown; no supplier date or guaranteed capacity. **Health:** At risk at performance/GPU join; assessment confidence medium where native failures/acceptance are observed, otherwise low for unobserved installed boundaries. **Next milestone / re-estimation trigger:** Bound remaining update-path/performance workload and obtain the single late GPU slot; stopped diagnostics are not reopened. + +### GAME-BOX2D-01 / GAME-PORTAL-01 P3 + +**Done, high confidence at the finite owning boundary.** Finite managed headless presentation, package-only/public Template adoption, preserving receiver and sixteen-stage structural-cost scope accepted. Browser/server/P4 are separate. No remaining tasks; complexity not applicable. Previous/current ETC 0 h, working and adverse. Completion is already accepted, no new time forecast or rework observed in the reviewed scope. Original/previous/current total and actual effort remain unknown. Reopen only on an explicitly selected new scope or evidence invalidating the existing acceptance; excluded product/fleet/native scopes are not included here. + +### FABLE-ADOPT-01 / GAME-TEMPLATE-01 + +- Reusable producer/reference coverage consolidation: **8–24 h working / 16–41 h adverse**; complexity high because all section-3 adapters and boundary mappings. +- Actual managed browser/WASM composition and conformance: **6–18 h working / 12–31 h adverse**; complexity high because worker lifecycle, imports and access/input. +- Template publication and distinct clean/retained assertions: **3–10 h working / 8–18 h adverse**; complexity medium because coherent package/source identity. + +**ETC:** 17–52 h working / 36–90 h adverse, low confidence over the listed prospective tasks. Previous/current working 17–52 → 17–52 h; adverse 36–90 → 36–90 h. Retained scenario, because reviewed evidence does not establish a reduction or newly bounded work; this is not a claim of unchanged actual effort. **Conditional active duration:** previous 5–13 → current 5–13 owner working days after named inputs, plus qualification/observation/CI waits. Whole calendar completion/date remains unknown; no supplier date or guaranteed capacity. **Health:** At risk; full installed reference pending; assessment confidence medium where native failures/acceptance are observed, otherwise low for unobserved installed boundaries. **Next milestone / re-estimation trigger:** Genuine installed browser/WASM reference after compatible producer availability; source candidates and public payload alone do not qualify it. + +### WASM-SHARED-01 + +- Freeze remaining guest SDK/profile population: **1–3 h working / 2–5 h adverse**; medium complexity, explicit support matrix. +- Terminal Process correction review, canonical model/traces, source and installed Worker qualification, coherent successor publication/readback: **3–8 h working / 6–16 h adverse**; high complexity, retirement ordering across effects/facades and genuine published bytes. This first additive scenario assumes the prepared implementation survives review. +- Other selected real guest/host entrypoints and failures: **4–14 h working / 8–25 h adverse**; high complexity, distinct toolchain/runtime boundaries; excludes the correction above. +- Consumer support and parity-proven duplicate retirement: **3–10 h working / 6–20 h adverse**; medium complexity, separate product acceptance. + +**ETC:** 11–35 h working / 22–66 h adverse, low confidence over the listed prospective tasks. 8–27 → 11–35 h: add 3–8 h for the discovered terminal Process correction and its qualified coherent successor. Existing 0.3.0 acceptance remains historical; this is a newly identified assertion in the existing outcome, not a new outcome. Previous adverse 16–50 → current 22–66 h. **Conditional active duration:** previous 2–7 → current 3–9 owner working days after named inputs, plus qualification/observation/CI waits. Whole calendar completion/date remains unknown; no supplier date or guaranteed capacity. **Health:** At risk; corrective source preparation; assessment confidence medium where native failures/acceptance are observed, otherwise low for unobserved installed boundaries. **Next milestone / re-estimation trigger:** Independent source disposition, then admitted model/source/installed checks and genuine coherent publication/readback before consumer pin. Owner 60–100 minute source-preparation estimate at 03:45 is not a qualification/publication forecast. + +### LEARN-01 + +- Receiver/producer causal joins and cold inactive runtime images: **6–18 h working / 11–30 h adverse**; complexity high because packaged runtime/toolchain closure. +- Genuine grant/turn/capture/restart/cleanup and census: **6–20 h working / 11–34 h adverse**; complexity high because provisioner evidence and real native lifecycle. +- Enrollment and locked/stopped-window comparison: **6–24 h working / 13–43 h adverse**; complexity high because authentic data and causal confounders. + +**ETC:** 18–62 h working / 35–107 h adverse, low confidence over the listed prospective tasks. Previous/current working 18–62 → 18–62 h; adverse 35–107 → 35–107 h. Retained scenario, because reviewed evidence does not establish a reduction or newly bounded work; this is not a claim of unchanged actual effort. **Conditional active duration:** previous 5–16 → current 5–16 owner working days after named inputs, plus qualification/observation/CI waits. Whole calendar completion/date remains unknown; no supplier date or guaranteed capacity. **Health:** Blocked at authentic runtime/receiver; assessment confidence medium where native failures/acceptance are observed, otherwise low for unobserved installed boundaries. **Next milestone / re-estimation trigger:** Supply actual persistent receiver host/volume/root/custody/access binding and qualify the existing maintained runtime; no supply date. + +### COORD-BOARD-V2-01 + +**Done, high confidence at the finite owning boundary.** Declared organization outcomes and two public qualification cohorts accepted. Unselected fleet/remote/skill routes and product acceptance excluded. No remaining tasks; complexity not applicable. Previous/current ETC 0 h, working and adverse. Completion is already accepted, no new time forecast or rework observed in the reviewed scope. Original/previous/current total and actual effort remain unknown. Reopen only on an explicitly selected new scope or evidence invalidating the existing acceptance; excluded product/fleet/native scopes are not included here. + +### V2-LANG-01 + +- Governance Verify/SDD capture and uncertain-close joins: **6–18 h working / 12–34 h adverse**; complexity high because actual package/provider effect boundary. +- Portable C3 release and C4 cold receiver/upgrade matrix: **6–20 h working / 12–37 h adverse**; complexity high because immutable profiles and distinct toolchains. +- TypeScript/Rust/Go real entrypoint adoption/cleanup: **6–20 h working / 12–39 h adverse**; complexity high because enforcing profile and serialization differences. + +**ETC:** 18–58 h working / 36–110 h adverse, low confidence over the listed prospective tasks. Previous/current working 18–58 → 18–58 h; adverse 36–110 → 36–110 h. Retained scenario, because reviewed evidence does not establish a reduction or newly bounded work; this is not a claim of unchanged actual effort. **Conditional active duration:** previous 5–15 → current 5–15 owner working days after named inputs, plus qualification/observation/CI waits. Whole calendar completion/date remains unknown; no supplier date or guaranteed capacity. **Health:** Blocked at package feed; medium confidence; assessment confidence medium where native failures/acceptance are observed, otherwise low for unobserved installed boundaries. **Next milestone / re-estimation trigger:** Read back required Commands and Artifacts 2.3.0 on the normal feed, then all required Governance gate contexts; publication owner/date unavailable. + +### OPS-TYPED-01 + +- Refresh bounded administrative owner/entrypoint population: **1–3 h working / 2–6 h adverse**; complexity medium because explicit production scope. +- Published replacement adoption and refusal/rollback proof: **3–10 h working / 6–21 h adverse**; complexity medium because ordinary consumers with known contracts. +- Retire replaced mechanics and verify owner migration: **2–6 h working / 4–13 h adverse**; complexity medium because multiple source/runtime owners. + +**ETC:** 6–19 h working / 12–40 h adverse, low confidence over the listed prospective tasks. Previous/current working 6–19 → 6–19 h; adverse 12–40 → 12–40 h. Retained scenario, because reviewed evidence does not establish a reduction or newly bounded work; this is not a claim of unchanged actual effort. **Conditional active duration:** previous 2–5 → current 2–5 owner working days after named inputs, plus qualification/observation/CI waits. Whole calendar completion/date remains unknown; no supplier date or guaranteed capacity. **Health:** Insufficient evidence for remaining adoption; assessment confidence medium where native failures/acceptance are observed, otherwise low for unobserved installed boundaries. **Next milestone / re-estimation trigger:** Freeze the remaining selected production entrypoints and qualify one actual published replacement/retirement. + +### FBX-07 + +- Refresh live upstream compatibility decision: **1–3 h working / 2–5 h adverse**; complexity medium because current compiler/support constraints. +- Resolve only selected upstream gaps and qualify compiler/runtime: **3–12 h working / 6–22 h adverse**; complexity high because netstandard2.1 and isolated generator outputs. +- Publish/adopt selected successor if change required: **2–6 h working / 4–13 h adverse**; complexity medium because existing public receiver route. + +**ETC:** 6–21 h working / 12–40 h adverse, low confidence over the listed prospective tasks. Previous/current working 6–21 → 6–21 h; adverse 12–40 → 12–40 h. Retained scenario, because reviewed evidence does not establish a reduction or newly bounded work; this is not a claim of unchanged actual effort. **Conditional active duration:** previous 2–6 → current 2–6 owner working days after named inputs, plus qualification/observation/CI waits. Whole calendar completion/date remains unknown; no supplier date or guaranteed capacity. **Health:** At risk at compatibility decision; assessment confidence medium where native failures/acceptance are observed, otherwise low for unobserved installed boundaries. **Next milestone / re-estimation trigger:** Refresh current upstream compatibility against the supported netstandard2.1 boundary before selecting a change. + +### UNITYC-01 + +- Bound exact current native/product scope and environment: **1–4 h working / 2–7 h adverse**; complexity high because unavailable private native evidence. +- Actual Editor/Server/native qualification: **4–16 h working / 8–31 h adverse**; complexity high because supplied proprietary/native runtime. +- Selected publication/installed adoption and product assertions: **4–16 h working / 10–32 h adverse**; complexity high because complete product scope not refreshed. + +**ETC:** 9–36 h working / 20–70 h adverse, low confidence over the listed prospective tasks. Previous/current working 9–36 → 9–36 h; adverse 20–70 → 20–70 h. Retained scenario, because reviewed evidence does not establish a reduction or newly bounded work; this is not a claim of unchanged actual effort. **Conditional active duration:** previous 3–9 → current 3–9 owner working days after named inputs, plus qualification/observation/CI waits. Whole calendar completion/date remains unknown; no supplier date or guaranteed capacity. **Health:** Insufficient evidence; environment dependency; assessment confidence medium where native failures/acceptance are observed, otherwise low for unobserved installed boundaries. **Next milestone / re-estimation trigger:** The first 1–4 active h bounds actual native scope and environment. Later unrelated-title/product scope is insufficiently bounded; the wider scenario is not a whole-product promise. + +### V3-ENV-01 + +- Complete fresh authentication source qualification and exact common image/reader input closure: **3–8 h working / 6–18 h adverse**; high complexity, host/unit identity, actual loaders, deadline and descriptor custody. Includes shared host authentication once for dependent UTEL/PROC/LANG/LEARN. +- Actual receiver binding, durable allocation/ACK and once-only handoff acceptance: **2–8 h working / 6–18 h adverse**; high complexity, delivered source reduces codec preparation but supplies no production persistence. +- Fresh storage and matched useful native build comparison: **4–12 h working / 7–23 h adverse**; high complexity, actual backing/profile and performance. +- Published installed provisioner/launcher, unattended allocation/launch/teardown and worker-loss recovery, plus selected stronger profile: **14–40 h working / 27–78 h adverse**; high complexity, source fixtures cannot prove ordinary installed use. +- Second-machine blank-slate journey and independent teardown: **4–12 h working / 9–24 h adverse**; high complexity, actual provisioner/machine supplier. + +**ETC:** 27–80 h working / 55–161 h adverse, low confidence over the listed prospective tasks. 29–84 → 27–80 h: delivered journal/checkpoint/transaction source reduces receiver codec work, while fresh authentication qualification retains substantial repair uncertainty. Source progress does not reduce unknown external waiting. Previous adverse 56–164 → current 55–161 h. **Conditional active duration:** previous 8–21 → current 7–20 owner working days after named inputs, plus qualification/observation/CI waits. Whole calendar completion/date remains unknown; no supplier date or guaranteed capacity. **Health:** Recovering at source; Churning in authentication qualification; Blocked operationally; assessment confidence medium where native failures/acceptance are observed, otherwise low for unobserved installed boundaries. **Next milestone / re-estimation trigger:** At cutoff: one new bounded metadata acquisition due 03:54 UTC, exact complete plan due 03:58, then separate qualification disposition. Those are owner checkpoints, not observed success. Production receiver tuple and second machine remain undated. + +### V3-IMPROVE-01 + +**Done, high confidence at the finite owning boundary.** Finite trial accepted: preflight, diagnostics, concise source guidance and selected source cohort. Throughput benefit unproven. DIAG and packaged installed transfers stay open with existing owners. No remaining tasks; complexity not applicable. Previous/current ETC 0 h, working and adverse. Completion is already accepted, no new time forecast or rework observed in the reviewed scope. Original/previous/current total and actual effort remain unknown. Reopen only on an explicitly selected new scope or evidence invalidating the existing acceptance; excluded product/fleet/native scopes are not included here. + +## Sources, freshness and calibration + +| Source | Revision / observation / coverage | +|---|---| +| [Unified v3 roadmap](../../roadmaps/2026-10-07-unified-development-roadmap-v3.md), linked local owning plans | Native main `63267427a1d6dbb05cdb637da0c3aa4e83f1a57d`, fetched/read 17 Oct 03:53–03:58 UTC; that roadmap file has the same last-change revision. All 19 declared outcomes covered. Native protected coherence run38981249183 passed. Later observations are excluded from the frozen cutoff. | +| [Previous report](2026-10-16-033400Z-unified-v3-progress.md) | Embedded cutoff 16 Oct 03:27:41 UTC, newest of six preceding reports. Prior engineering-hour scenarios reused and explicitly revised; no original total/actual effort inferred. | +| Separate trailing-day baseline | First-parent main `7eccb9d0c5803b680509454c8e998cb9ebef9612`, committed 16 Oct 03:38:15 UTC, before window start 03:53. Formal source status 3/19; runtime/readiness/effort coverage incomplete. | +| Native PR inventories | Read about 17 Oct 03:54 UTC, updated since 16 Oct 03:27:41. Search total/returned: .github 41/41; Coordination 17/17; Rendering, Templates, Game, SDD, Governance, Unity Client and FsQuint 0/0. No search truncation; no claim to cover unpublished branches, private runtime or all consumers. Merged timestamps establish credited events. | +| [UTEL containment #4600](https://github.com/FS-GG/.github/issues/4600), [authority #4601](https://github.com/FS-GG/.github/issues/4601) | Native bodies updated 03:50:53/54 UTC, read before cutoff. Public owner/acceptance projections; original comment timestamps and immutable source identities used for timeline. Private native delivery remains supplier-observed and is not independently authenticated by this report. | +| [SDD knowledge owner](https://github.com/FS-GG/FS.GG.SDD/blob/3555ce34456d0d60f1ad63852e40c8f179cc70dd/docs/roadmaps/tsdd-knowledge-01.md) | Protected head `3555ce34`, fetched around 03:56. Bounded implementation/retained fixture and remaining public provider boundaries. Historical embedded paragraphs are not current deployment claims. | +| [Governance owner](https://github.com/FS-GG/FS.GG.Governance/blob/1b9c76ce3f788411bc221ad12886bf46444b7637/docs/roadmaps/governance-423-neutral-capability-bindings.md), [draft #462](https://github.com/FS-GG/FS.GG.Governance/pull/462) | Main `1b9c76ce`; draft exact `bf2a3687`, unchanged updated_at 16 Oct 00:10:20. Fresh native read retains package block; focused source claims do not supply whole normal gate. | +| [Coordination LEARN owner](https://github.com/FS-GG/FS.GG.Coordination/blob/638a04761d7ff2ff7578da398b2188ba6e34bfc3/docs/roadmaps/learn-01-actor-observation.md) | Protected `638a0476`, read around 03:56; causal source versus genuine receiver/runtime boundary. #1024/#1025 run identities independently queried; postmerge #1025 retry/acceptance uses public owner readback. | +| [Templates FBX owner](https://github.com/FS-GG/FS.GG.Templates/blob/f5fbd06ed9e6df40f9037c7acddf9eca3c6a14fc/docs/roadmaps/fable-bindings-xantham-candidates.md) | Protected `f5fbd06e`, read around 03:56; public 0.19 receiver acceptance retained, upstream support still unqualified. No fresh upstream assessment performed for this report. | +| [Unity owner](https://github.com/FS-GG/FS.GG.Unity.Client/blob/d83e4143cd5dec5ace1c5af80db1cd481ad4fc63/docs/roadmaps/unityc-01-reference-admission.md) | Protected `d83e4143`, read around 03:56; .1d remains unchecked and later product population broad. Historical environment absence is not a fresh host inventory. | +| Shared WASM prepared correction | Local immutable Game `fc7da994bd2eb71dc442afe814cb7915165c03ab` against `4163448cfc69d428e136853212765690265b92c6`, inspected after cutoff; candidate was prepared at 03:52 per owner. Its owning plan explicitly marks model/runtime/pack/publication unrun. No publicly delivered candidate link existed at cutoff. Accepted 0.3 scope remains in [shared foundation](../../roadmaps/2026-10-02-shared-wasm-foundation.md). | +| Atlas | Retrieved `platform/acceptance-boundaries`, `platform/shared-product-acceptance`, `github/telemetry-dashboard-facts-first-presentation`, `platform/routine-delivery-checkout-producer`, `github/utel-fresh-profile-resource-containment`; all 15 cited immutable file SHA-256 values verified locally. Existing records cover the report's boundaries. | +| [Method](../../../.agents/skills/show-progress/references/estimation-method.md), [structure](../../../.agents/skills/show-progress/references/report-template.md), [research](../../../.agents/skills/show-progress/references/research.md) | Invoked current workspace show-progress/2 instructions: SKILL SHA-256 `76dbe3649fad810645e4011e87e67115b6e21017e36a74bffc915cfe435de528`; estimation-method SHA-256 `bf557de01ae0855cacb9b57285b074abfe50d379dce8e6517bc086aaaaf46abf`. These include the user-edited process-health presentation and report-only delivery. The pre-existing modified skill files are excluded from this report commit. Method research unchanged; no new probabilistic model. | + +Atlas capture disposition: this is a cutoff-bound evidence report, not a new architecture/contract decision. Existing curated records still cover its conclusions; bulk operational timelines are excluded from Atlas. No new record/supersession is needed and no private evidence is copied. The Game correction's source-only Atlas preparation remains with its owner and is not a report-delivered contract. + +Calibration remains unavailable for whole outcomes: no unchanged-scope completed cohort with original date forecasts and attributed effort. One narrow source-preparation checkpoint—about 40 minutes against a stated 35–45 minutes—was within its interval; n=1, approximate start, and source-only finish cannot calibrate runtime/publication. The Game 60–100-minute preparation interval is still unresolved for reviewed source at cutoff; an early candidate is not accepted completion. Re-estimate after actual authenticated qualification, real receiver binding, fresh operational telemetry, exact Governance feed availability or genuine WASM installed successor acceptance. These triggers schedule no automation and dispatch no work.