Skip to content

PLH250DCPS power supply #338

Description

@Relm-Arrowny

Goals

Acceptance criteria : What journeys should the user be able to complete to consider your feature done
Be as specific as you can, check them off once they work. Add more if you find more requirements during development. Issue should only be considered done after all of them are checked

  • User should be able to launch PLH250DCPS server via sm_bluesky start cli command
  • Document the new routine startup procedure for the beamline team
  • Server automatically reconnects if the physical power supply is power-cycled.
  • Optional: Remove the need for user to look up IP manually.

Tasks

base on the goals, deduce the tasks required. check them off once they're done

  • Create PLH250DCPS base on AbstractInstrumentServer.
  • Add cli to start the server.
  • Update gda scanable.
  • Look into the possibility of getting the IP of the connected instrument via its MAC address.

Related Resources

Possible options for getting the IP:
Scapy
get-mac

Metadata

Metadata

Assignees

No one assigned

    Labels

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions