Repository navigation
Inverter lifetime uses max years #199
BenWinchester
started this conversation in
IAA
Replies: 2 comments
|
@BenWinchester , check the following:
|
0 replies
⬆️ Promotion to issue ⬆️As this is a 🐛 (bug), an issue will be created from this within the main repo of CLOVER as well as the IAA project so that it can be addressed sooner rather than later 😄 |
0 replies
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Uh oh!
There was an error while loading. Please reload this page.
Describe the bug
The inverter lifetime in optimisations and simulations in CLOVER is based on the
max_yearsvariable, the purpose of which is for the solar data fetching and which should not be used for other functionality, and hence the inverter replacement intervals are incorrect.To Reproduce
Steps to reproduce the behavior:
pdbat line 297 ofimpact/finance.pyonv5.0.7replacement_intervalsvariableExpected behaviour
The start and end years of a simulation should be used to determine the inverter replacement periods.
Additional Information
Desktop
v5.0.7masterand all downstream branchesAll reactions