Skip to content

Latest commit

 

History

History
30 lines (23 loc) · 1.64 KB

File metadata and controls

30 lines (23 loc) · 1.64 KB

Phase-2 delivery status

Last updated: 2026-07-15 · Superseded by product 1.0.0 (see PHASE3-STATUS.md)

ID Theme Status Evidence
P2-A Memory 2.0 Done packages/memory scoped brain; Memory page; tools scope
P2-B Import wizard Done import-wizard.ts + Import page IPC
P2-C Sub-agents Done subagent.ts + manager.spawn + Chat spawn + Tasks child tree
P2-D Usage & cost Done usage.ts + Usage page + prefs pricing
P2-E Eval lab Done scripts/eval.mjs · pnpm eval
P2-F Packaging Done electron-builder + PACKAGING.md; manual update notes in Settings
P2-G Runtime harden Done redact, plan mode, budgets, diagnostics, single-instance, audit M3.0
P2-H MCP enhance Done headers, ping (OAuth / full streamable-HTTP still later)
P2-I Coding deepen Done git_diff / git_show / git_commit; Changes filter + open-in-editor; AGENTS.md editor; Terminal one-shot run (non-PTY)

Explicit non-goals still out (not Phase-2 incomplete)

  • IM gateway, dual-write OpenClaw, SaaS multi-tenant
  • OAuth MCP, full Streamable-HTTP
  • Vector embedding models (BM25 only)
  • Full session Worker process isolationshipped in Phase-3 M3.3
  • Real interactive PTY (node-pty) — still deferred; Terminal one-shot shell:run
  • Auto-updater — 1.0 manual channel (see PACKAGING.md)

Post-RC

Full code audit + Phase-3 plan: AUDIT.md · PHASE3.md · PHASE3-STATUS.md · packaging PACKAGING.md