Skip to content

fix(refinery): verify push landed before closing MR — phantom-done gu… #13

fix(refinery): verify push landed before closing MR — phantom-done gu…

fix(refinery): verify push landed before closing MR — phantom-done gu… #13

Triggered via push June 14, 2026 18:59
Status Failure
Total duration 10m 57s
Artifacts

ci.yml

on: push
Reject go.mod replace directives
0s
Reject go.mod replace directives
Reject issues.jsonl
0s
Reject issues.jsonl
Test
10m 55s
Test
Lint
40s
Lint
Integration Tests
6m 18s
Integration Tests
Fit to window
Zoom out
Zoom in

Annotations

13 errors
FAIL github.com/steveyegge/gastown/internal/cmd.TestAgentWorktreesStayClean/RepoWithTrackedBeads
rig_integration_test.go:1153: gt install failed: exit status 1
FAIL github.com/steveyegge/gastown/internal/cmd.TestAgentWorktreesStayClean/RepoWithoutBeads
rig_integration_test.go:1153: gt install failed: exit status 1
FAIL github.com/steveyegge/gastown/internal/cmd.TestFreshInstallRigPolecatHookIntegration
fresh_setup_integration_test.go:44: /tmp/gt-integration-test [install /tmp/TestFreshInstallRigPolecatHookIntegration2218131543/001/town --name test-town --git --dolt-port 40883] failed: exit status 1
FAIL github.com/steveyegge/gastown/internal/cmd.TestBeadsDbInitAfterClone/MissingMetadataTriggersReInit
beads_db_init_test.go:372: gt install failed: exit status 1
FAIL github.com/steveyegge/gastown/internal/cmd.TestBeadsDbInitAfterClone/TrackedRepoWithPrefixMismatchErrors
beads_db_init_test.go:273: gt install failed: exit status 1
FAIL github.com/steveyegge/gastown/internal/cmd.TestBeadsDbInitAfterClone/TrackedRepoWithNoIssuesRequiresPrefix
beads_db_init_test.go:212: gt install failed: exit status 1
FAIL github.com/steveyegge/gastown/internal/cmd.TestBeadsDbInitAfterClone/TrackedRepoWithExistingPrefix
beads_db_init_test.go:150: gt install failed: exit status 1
Integration Tests
Process completed with exit code 1.
FAIL github.com/steveyegge/gastown/internal/doltserver.TestInitRigSeedsIssuePrefixEmbedded
doltserver_test.go:2321: InitRig: ensuring issue_prefix for database "testrig": migrating beads schema: bd migrate --yes in /tmp/TestInitRigSeedsIssuePrefixEmbedded1878490653/001/testrig/.beads: : exe
Test
Process completed with exit code 1.