Skip to content

Latest commit

 

History

History
215 lines (160 loc) · 6.93 KB

File metadata and controls

215 lines (160 loc) · 6.93 KB

Planned Features

This directory contains proposals and enhancement plans for features that are not yet implemented in Allium.

Looking for behavior that is already shipped? See docs/features/implemented/.

🚀 Status

These features represent the roadmap for future development. They are:

  • Not yet implemented in code
  • 📋 Proposed with varying levels of design detail
  • 🎯 Prioritized by milestone and timeline
  • 💡 Open for community input and contributions

📅 Implementation Roadmap

Milestone 1: Interactive Visualizations (Q1 2025)

File: milestone-1-graphs-charts.md
Timeline: 12 weeks
Priority: Critical Foundation

Features:

  • Geographic heat map dashboard
  • Platform diversity visualization
  • AROI achievement wheel
  • Network authority donut charts
  • Mobile-first responsive design

Dependencies: D3.js/Chart.js integration

Milestone 2: Advanced Authority Monitoring (Q2 2025)

File: milestone-2-authority-health.md
Timeline: 12 weeks
Builds on: Basic authority monitoring (implemented)

Features:

  • Real-time authority status dashboard
  • Consensus health scraping integration
  • Authority performance analytics
  • Authority geolocation tracking
  • Consensus formation timeline

Dependencies: Real-time data pipeline

Milestone 3: Intelligent Network Health (Q3 2025)

File: milestone-3-network-health.md
Timeline: 12 weeks
Builds on: Basic health dashboard (implemented)

Features:

  • Real-time health monitoring (sub-5 second refresh)
  • Predictive relay failure detection (>85% accuracy)
  • Automated downtime alerts
  • Network capacity forecasting

Dependencies: ML/AI infrastructure

Milestone 4: AI/ML Analytics (Q4 2025)

File: milestone-4-ai-analytics.md
Timeline: 16 weeks
Priority: Advanced Intelligence

Features:

  • AI-powered anomaly detection
  • Network optimization recommendations
  • Predictive network modeling (3-month forecasts)
  • Behavioral pattern analysis
  • Network resilience modeling

Dependencies: ML pipeline, training data

Milestone 5: Community Platform (Q1 2026)

File: milestone-5-community-tools.md
Timeline: 12 weeks
Priority: Community Engagement

Features:

  • Advanced operator dashboard
  • Community API & developer tools (1000+ req/hour)
  • Collaborative network planning
  • Mobile apps (iOS/Android)
  • Multi-language support

Dependencies: API infrastructure, mobile frameworks


📊 Individual Proposals

Enhanced Analytics

Advanced Features

Specialized Systems

Roadmap Documents

Other Proposals


🎯 Implementation Priorities

High Priority (Next 6 Months)

  1. ✨ Interactive visualizations (Milestone 1)
  2. 📊 Historical bandwidth metrics
  3. 🔍 Operator comparison metrics

Medium Priority (6-12 Months)

  1. 🏛️ Advanced authority monitoring (Milestone 2)
  2. 📈 Intelligent network health (Milestone 3)
  3. 🔗 Enhanced smart context links

Long-Term (12+ Months)

  1. 🤖 AI/ML analytics (Milestone 4)
  2. 👥 Community platform (Milestone 5)
  3. 🌉 Bridge network monitoring
  4. 💾 ClickHouse integration

💡 Contributing

Implementing a Planned Feature

  1. Choose a feature from this directory
  2. Review the proposal thoroughly
  3. Check dependencies - ensure prerequisites are met
  4. Open an issue on GitHub announcing intent
  5. Implement following development guidelines
  6. Test comprehensively
  7. Document in user guides
  8. Move to implemented/ directory after verification

Proposing a New Feature

  1. Check existing proposals to avoid duplication
  2. Use proposal template (see existing files for format)
  3. Include: Problem, solution, technical approach, dependencies, timeline
  4. Submit PR with proposal document
  5. Discuss with community
  6. Refine based on feedback

📚 Proposal Format

Each proposal should include:

Header

  • Status: ❌ Not implemented
  • Timeline: Estimated implementation time
  • Priority: High/Medium/Low
  • Dependencies: What must exist first

Content

  • Problem Statement: What needs solving
  • Proposed Solution: How to solve it
  • Technical Approach: Implementation details
  • Performance Targets: Expected metrics
  • User Benefits: Value proposition
  • Implementation Plan: Step-by-step approach

🔗 Related Documentation


📊 Statistics

Metric Count
Total Proposals 20+ documents
Milestones 5 major milestones
Timeline Q1 2025 - Q1 2026
Estimated Features 100+ individual features

⚠️ Important Notes

  • Not Implemented: Features here do NOT exist in current code
  • Subject to Change: Proposals may be modified based on feedback
  • No Timeline Guarantee: Timelines are estimates, not commitments
  • Community Driven: All proposals welcome community input

Last Updated: 2025-11-23
Status: Roadmap for future development
Verification: These features do NOT exist in generated output